top of page
NEWS / RENOVATION PROJECTS:
2025 RENOVATION
2025 Renovation & Repairs
Building Renovation & Repairs
November 2025
The Church building and three-bay storage barn are currently undergoing several exterior renovations this month.
The renovations include replacement and repair of fascias located in the front of the church and those extending along the back. Rotted wood and damaged soffits are being replaced or repaired, and siding will either be refastened or replaced. In addition, several rotted or damaged sections on the front of the storage barn will be replaced. The newly installed wood is to receive a fresh coat of cedar stain.
These renovations will revitalize and protect the areas of the structures that were damaged due to having faced harsh weather conditions in the past.
Trustee

Project Photos
Select a photo to view it larger.
Before Renovations

After Renovations
bottom of page





